Brief introduction to the safety operations that should be paid attention to whe


(I) Start-up operation


1. For newly installed furnace bodies, the gas should be carefully tested before debugging to see if it meets the requirements of the burner; check whether the detection instruments on the gas supply pipeline are normal and whether the pipeline valves are open and closed normally, and whether it is convenient for future use and maintenance.


2. For newly installed pipelines, the installation reliability and sealing of all pipelines should be carefully checked.


3. Users who use a separate gasification station must ensure that the gas supply volume and gas supply parameters meet the requirements of safe combustion.


4. Operators should carefully read the equipment manual and master the knowledge and methods of safe operation.


5. Before each startup, check whether the gas valve is open, otherwise the burner will not work.


6. Start the power control button on the control cabinet. At this time, the digital display will show the current furnace temperature. This temperature of the newly installed furnace body is the ambient temperature.


7. Start the fan control button, and the fan installed on the furnace body will work. If the fan is damaged, the control cabinet will automatically protect and not enter the next step.


8. When the combustion fan works without abnormal phenomena, start the combustion control button again, and the combustion program controller will start working. It performs ignition, gas supply, flame detection, and other procedures to achieve safe combustion.


9. When the combustion controller receives a signal that is not conducive to combustion (for example: ignition failure, unstable air pressure, circuit problems), etc., the combustion controller will immediately shut down the gas and send out an alarm signal.


10. If the combustion controller alarms, it should be manually reset by the operator after the fault is resolved before it can continue to work.


11. For the operation of the entire equipment, the operator should refer to the furnace body insurance operation procedures and production process requirements for operation.


12. When the control temperature needs to be adjusted according to the production process requirements, the operator should refer to the manual of the intelligent CNC table for adjustment.


(II) Shutdown operation


1. There are two situations for shutdown: one is: when the furnace temperature reaches the set value, it will automatically shut down. At this time, the operator does not need to do anything. When the furnace temperature is lower than the set value, the controller will automatically start up.


2. When the machine is shut down manually or during shift change, the operator should shut down the machine in the reverse order of the start-up (a. turn off the combustion control button first, b. turn off the fan button, c. turn off the power button).


3. When the shutdown time is long, the operator should close the gas pipeline valve to avoid gas leakage.


  • Requirements for gas pipeline connection of household gas burning appliances
  • Safety control requirements for natural gas boiler burners
  • Introduction to boiler combustion equipment
  • Basic introduction to crude oil burners
  • Test methods for oil leakage, oil dripping and air tightness of integrated oil b
  • Several special methods for repairing burner faults
  • Reasons for high gas consumption of gas boilers
  • Introduction to the price of oil-fired boilers and the role of oil tanks
  • Explanation of the natural gas consumption and protection device of a 4-ton gas
  • How to use and maintain the burner of a gas boiler

Back

Brief introduction to the safety operations that should be paid attention to whe


(I) Start-up operation


1. For newly installed furnace bodies, the gas should be carefully tested before debugging to see if it meets the requirements of the burner; check whether the detection instruments on the gas supply pipeline are normal and whether the pipeline valves are open and closed normally, and whether it is convenient for future use and maintenance.


2. For newly installed pipelines, the installation reliability and sealing of all pipelines should be carefully checked.


3. Users who use a separate gasification station must ensure that the gas supply volume and gas supply parameters meet the requirements of safe combustion.


4. Operators should carefully read the equipment manual and master the knowledge and methods of safe operation.


5. Before each startup, check whether the gas valve is open, otherwise the burner will not work.


6. Start the power control button on the control cabinet. At this time, the digital display will show the current furnace temperature. This temperature of the newly installed furnace body is the ambient temperature.


7. Start the fan control button, and the fan installed on the furnace body will work. If the fan is damaged, the control cabinet will automatically protect and not enter the next step.


8. When the combustion fan works without abnormal phenomena, start the combustion control button again, and the combustion program controller will start working. It performs ignition, gas supply, flame detection, and other procedures to achieve safe combustion.


9. When the combustion controller receives a signal that is not conducive to combustion (for example: ignition failure, unstable air pressure, circuit problems), etc., the combustion controller will immediately shut down the gas and send out an alarm signal.


10. If the combustion controller alarms, it should be manually reset by the operator after the fault is resolved before it can continue to work.


11. For the operation of the entire equipment, the operator should refer to the furnace body insurance operation procedures and production process requirements for operation.


12. When the control temperature needs to be adjusted according to the production process requirements, the operator should refer to the manual of the intelligent CNC table for adjustment.


(II) Shutdown operation


1. There are two situations for shutdown: one is: when the furnace temperature reaches the set value, it will automatically shut down. At this time, the operator does not need to do anything. When the furnace temperature is lower than the set value, the controller will automatically start up.


2. When the machine is shut down manually or during shift change, the operator should shut down the machine in the reverse order of the start-up (a. turn off the combustion control button first, b. turn off the fan button, c. turn off the power button).


3. When the shutdown time is long, the operator should close the gas pipeline valve to avoid gas leakage.


RIELLO

Shanghai Qigu Technology Co., LTD
Block I-J, 14th Floor, Greenland Kechuang Building, 201 Ningxia Road, Putuo District, Shanghai
CHINA China,200333
Burner:Contact +08613761094501
Boiler:Contact +08613761094501
Fax :+08613761094501
E-mail:pittsenli@gmail.com


© Qigu Technology – copyright


Navigation

About Us
Burner
Low nitrogen burner
High temperature burner
Special burner
After service
Company
Contact

Networks

International
België/Belgique (Belgium)
Canada
中国 (China)
Hrvatska (Croatia)
Česká Republika (Czech Republic)
France (France)
Deutschland (Germany)
Magyarország (Hungary)
Italia (Italy)
Latvija (Latvia)
Polska (Poland)
România (Romania)
Россия (Russia)
España (Spain)
Slovenija (Slovenia)
United Kingdom
United States

Link

  • riello spare parts
  • plc control cabinets
  • 空压机配件
  • 电气控制柜
  • 利雅路燃烧器