(1) Power-on operation:
1. For newly installed furnaces, before debugging, you should carefully check whether the gas meets the requirements of the burner; check whether the detection instruments on the gas supply pipeline are normal and whether the pipeline valves are opening and closing normally, and whether they are convenient for future use and maintenance.
2. For newly installed pipelines, the installation reliability of all pipelines and the tightness of the pipelines should be carefully checked.
3. Users who use a separate gasification station must ensure that the gas supply volume and gas supply parameters meet the requirements for safe combustion.
4. Operators must carefully read the equipment instruction manual and be proficient in safe operation knowledge and methods.
5. Check whether the gas valve is open before starting the machine each time, otherwise the burner will not work.
6. Turn on the power control button on the control cabinet. At this time, the digital display will display the current temperature in the furnace. This temperature of the newly installed furnace body is the ambient temperature.
7. Turn on the fan control button and the fan installed on the furnace body will work. At this time, if the fan is damaged, the control cabinet will be automatically protected from entering the next operation.
8. When the combustion fan works without abnormality, start the combustion control button again. At this time, the combustion program controller starts to work. It carries out ignition, air supply, flame detection, etc. through certain procedures to finally achieve safe combustion.
9. When the combustion controller receives signals that are not conducive to combustion (for example: ignition failure, unstable air pressure, circuit problems) and other problems, the combustion controller immediately turns off the gas and sends an alarm signal.
10. If the combustion controller alarms, it must be manually reset by the operator after the fault is resolved before it can continue to work.
11. For the operation of the entire equipment, operators should refer to the furnace safety operating procedures and production process requirements.
12. When the control temperature needs to be adjusted according to the production process requirements, the operator should refer to the instructions of the intelligent CNC meter for adjustment.
(2) Shutdown operation:
(1) There are two situations of shutdown: The first is: when the temperature in the furnace reaches the set value, it will automatically shut down. At this time, the operator does not need to do anything. When the temperature in the furnace is lower than the set value, the controller will automatically turn on.
(2) The second is: during manual shutdown and shift handover shutdown, the operator should press the reverse order of starting the machine (a. Turn off the combustion control button first, b. Then turn off the fan button, c. Finally turn off the power button Twist) to shut down.
(3) When the shutdown time is long, the operator should close the gas pipeline valve to avoid gas leakage.
(1) Power-on operation:
1. For newly installed furnaces, before debugging, you should carefully check whether the gas meets the requirements of the burner; check whether the detection instruments on the gas supply pipeline are normal and whether the pipeline valves are opening and closing normally, and whether they are convenient for future use and maintenance.
2. For newly installed pipelines, the installation reliability of all pipelines and the tightness of the pipelines should be carefully checked.
3. Users who use a separate gasification station must ensure that the gas supply volume and gas supply parameters meet the requirements for safe combustion.
4. Operators must carefully read the equipment instruction manual and be proficient in safe operation knowledge and methods.
5. Check whether the gas valve is open before starting the machine each time, otherwise the burner will not work.
6. Turn on the power control button on the control cabinet. At this time, the digital display will display the current temperature in the furnace. This temperature of the newly installed furnace body is the ambient temperature.
7. Turn on the fan control button and the fan installed on the furnace body will work. At this time, if the fan is damaged, the control cabinet will be automatically protected from entering the next operation.
8. When the combustion fan works without abnormality, start the combustion control button again. At this time, the combustion program controller starts to work. It carries out ignition, air supply, flame detection, etc. through certain procedures to finally achieve safe combustion.
9. When the combustion controller receives signals that are not conducive to combustion (for example: ignition failure, unstable air pressure, circuit problems) and other problems, the combustion controller immediately turns off the gas and sends an alarm signal.
10. If the combustion controller alarms, it must be manually reset by the operator after the fault is resolved before it can continue to work.
11. For the operation of the entire equipment, operators should refer to the furnace safety operating procedures and production process requirements.
12. When the control temperature needs to be adjusted according to the production process requirements, the operator should refer to the instructions of the intelligent CNC meter for adjustment.
(2) Shutdown operation:
(1) There are two situations of shutdown: The first is: when the temperature in the furnace reaches the set value, it will automatically shut down. At this time, the operator does not need to do anything. When the temperature in the furnace is lower than the set value, the controller will automatically turn on.
(2) The second is: during manual shutdown and shift handover shutdown, the operator should press the reverse order of starting the machine (a. Turn off the combustion control button first, b. Then turn off the fan button, c. Finally turn off the power button Twist) to shut down.
(3) When the shutdown time is long, the operator should close the gas pipeline valve to avoid gas leakage.