行业新闻


Installation and operation process of industrial large burner


文章10-2.jpg


1. For large burners installed in the industry, carefully check whether the gas meets the requirements of the burner before commissioning; check whether the detection instrument on the gas supply pipeline is normal, whether the switch of the pipeline valve is normal, and whether it is convenient for future use and maintenance.




2. For newly installed pipelines, the installation reliability and sealing performance of all pipelines should be carefully checked.




3. Users who use independent gasification stations should ensure that the gas supply volume and gas supply parameters meet the requirements for safe combustion.




4. Operators should carefully read the operating instructions of industrial large burners to master the knowledge and methods of safe operation.




5. Check whether the gas valve is open before each start, otherwise the burner cannot work.




6. Start the power control button on the control cabinet. At this point, the digital indicator will show the current furnace temperature. The temperature of the furnace body installed in Xin'an is the ambient temperature.




7. Start the industrial large burner fan control button, and the fan installed on the furnace body will work. If the fan damages the control cabinet at this time, it will be automatically protected in the next operation.




8. When the combustion-supporting fan runs without any abnormality, start the combustion control button again. At this time, the combustion program controller starts to work. Through certain procedures, procedures such as ignition, gas supply, and flame detection are carried out, and finally safe combustion is realized.




9. When the industrial large-scale burner combustion controller receives signals that are not conducive to combustion (such as ignition failure, unstable air pressure, circuit problems) and other problems, the combustion controller immediately shuts off the gas and sends out an alarm signal.




10. If the combustion controller gives an alarm, after the fault is resolved, it must be manually reset by the operator before continuing to work.




11. For the operation of the entire equipment, the operator should refer to the safety operation regulations and production process requirements of industrial large burners.




12. When the control temperature needs to be adjusted according to the requirements of the production process, the operator should refer to the manual of the intelligent numerical control table for adjustment.


  • What factors should be considered when selecting a linear burner
  • Causes and solutions for RTO burner flameout
  • Safety control requirements for boiler gas burners
  • Gas boiler water treatment problem solution
  • What to do if the burner does not ignite
  • Riello burners should be selected according to gas pressure
  • Conditions for shutdown of boiler due to accident
  • What tools are there for boiler burners
  • How to use the burner igniter
  • Gas filter maintenance and care

Back

Installation and operation process of industrial large burner


文章10-2.jpg


1. For large burners installed in the industry, carefully check whether the gas meets the requirements of the burner before commissioning; check whether the detection instrument on the gas supply pipeline is normal, whether the switch of the pipeline valve is normal, and whether it is convenient for future use and maintenance.




2. For newly installed pipelines, the installation reliability and sealing performance of all pipelines should be carefully checked.




3. Users who use independent gasification stations should ensure that the gas supply volume and gas supply parameters meet the requirements for safe combustion.




4. Operators should carefully read the operating instructions of industrial large burners to master the knowledge and methods of safe operation.




5. Check whether the gas valve is open before each start, otherwise the burner cannot work.




6. Start the power control button on the control cabinet. At this point, the digital indicator will show the current furnace temperature. The temperature of the furnace body installed in Xin'an is the ambient temperature.




7. Start the industrial large burner fan control button, and the fan installed on the furnace body will work. If the fan damages the control cabinet at this time, it will be automatically protected in the next operation.




8. When the combustion-supporting fan runs without any abnormality, start the combustion control button again. At this time, the combustion program controller starts to work. Through certain procedures, procedures such as ignition, gas supply, and flame detection are carried out, and finally safe combustion is realized.




9. When the industrial large-scale burner combustion controller receives signals that are not conducive to combustion (such as ignition failure, unstable air pressure, circuit problems) and other problems, the combustion controller immediately shuts off the gas and sends out an alarm signal.




10. If the combustion controller gives an alarm, after the fault is resolved, it must be manually reset by the operator before continuing to work.




11. For the operation of the entire equipment, the operator should refer to the safety operation regulations and production process requirements of industrial large burners.




12. When the control temperature needs to be adjusted according to the requirements of the production process, the operator should refer to the manual of the intelligent numerical control table for adjustment.


RIELLO

Shanghai Qigu Technology Co., LTD
Block I-J, 14th Floor, Greenland Kechuang Building, 201 Ningxia Road, Putuo District, Shanghai
CHINA China,200333
Burner:Contact +08613761094501
Boiler:Contact +08613761094501
Fax :+08613761094501
E-mail:pittsenli@gmail.com


© Qigu Technology – copyright


Navigation

About Us
Burner
Low nitrogen burner
High temperature burner
Special burner
After service
Company
Contact

Networks

International
België/Belgique (Belgium)
Canada
中国 (China)
Hrvatska (Croatia)
Česká Republika (Czech Republic)
France (France)
Deutschland (Germany)
Magyarország (Hungary)
Italia (Italy)
Latvija (Latvia)
Polska (Poland)
România (Romania)
Россия (Russia)
España (Spain)
Slovenija (Slovenia)
United Kingdom
United States

Link

  • riello spare parts
  • plc control cabinets
  • 空压机配件
  • 电气控制柜
  • 利雅路燃烧器