Installation method and steps of boiler dust removal equipment


When installing boiler dust removal equipment, it is necessary to install it according to the correct installation method and steps. Generally, before installation, the installation position should be determined first, and then the installation should be carried out according to the steps:


1. Install the boiler dust collector bracket


After checking that the foundation meets the drawings and quality requirements, install the anchor bolts on the bracket, and then place the bracket on the foundation with the reference line drawn.


2. Install the boiler dust collector


After the bracket is installed, hoist the dust removal equipment and tighten the bolts connecting the dust collector and the bracket. When hoisting, it can be installed in sections or as a whole according to the situation (vertical or horizontal). The flanges connected to the dust collector should be tightly connected, and asbestos twisted rope should be used as gaskets. The gaskets should be added on the inside of the connecting bolts.


3. Install the smoke pipe of the boiler dust collector


First install the smoke pipe and the diffusion pipe of the dust collector from the outlet of the economizer or the outlet of the rear smoke box of the boiler. The flange connection between the smoke pipes uses asbestos rope as a gasket, and the connection should be tight. After the smoke pipe is installed, check whether the flange of the diffusion pipe and the inlet flange of the dust collector are in the right position. If it is slightly inappropriate, adjust the position and elevation of the dust collector bracket appropriately to make the dust collector and the smoke pipe properly connected.


4. Check the verticality and horizontality of the dust collector


After the dust collector and smoke pipe are installed, check the verticality and horizontality of the dust collector and the bracket. The verticality and horizontality error of the dust collector is 1/1000, and then pour concrete into the anchor bolt hole. When the strength of the concrete reaches 75%, tighten the anchor bolt.


5. Install the air lock


The air lock is an important part of the dust collector and one of the key parts to ensure the effect of the dust removal equipment. Therefore, the connection of the air lock and the tongue plate should be in close contact, and the counterweight or hanging ring should be appropriate.


  • Requirements for gas pipeline connection of household gas burning appliances
  • Safety control requirements for natural gas boiler burners
  • Introduction to boiler combustion equipment
  • Basic introduction to crude oil burners
  • Test methods for oil leakage, oil dripping and air tightness of integrated oil b
  • Several special methods for repairing burner faults
  • Reasons for high gas consumption of gas boilers
  • Introduction to the price of oil-fired boilers and the role of oil tanks
  • Explanation of the natural gas consumption and protection device of a 4-ton gas
  • How to use and maintain the burner of a gas boiler

Back

Installation method and steps of boiler dust removal equipment


When installing boiler dust removal equipment, it is necessary to install it according to the correct installation method and steps. Generally, before installation, the installation position should be determined first, and then the installation should be carried out according to the steps:


1. Install the boiler dust collector bracket


After checking that the foundation meets the drawings and quality requirements, install the anchor bolts on the bracket, and then place the bracket on the foundation with the reference line drawn.


2. Install the boiler dust collector


After the bracket is installed, hoist the dust removal equipment and tighten the bolts connecting the dust collector and the bracket. When hoisting, it can be installed in sections or as a whole according to the situation (vertical or horizontal). The flanges connected to the dust collector should be tightly connected, and asbestos twisted rope should be used as gaskets. The gaskets should be added on the inside of the connecting bolts.


3. Install the smoke pipe of the boiler dust collector


First install the smoke pipe and the diffusion pipe of the dust collector from the outlet of the economizer or the outlet of the rear smoke box of the boiler. The flange connection between the smoke pipes uses asbestos rope as a gasket, and the connection should be tight. After the smoke pipe is installed, check whether the flange of the diffusion pipe and the inlet flange of the dust collector are in the right position. If it is slightly inappropriate, adjust the position and elevation of the dust collector bracket appropriately to make the dust collector and the smoke pipe properly connected.


4. Check the verticality and horizontality of the dust collector


After the dust collector and smoke pipe are installed, check the verticality and horizontality of the dust collector and the bracket. The verticality and horizontality error of the dust collector is 1/1000, and then pour concrete into the anchor bolt hole. When the strength of the concrete reaches 75%, tighten the anchor bolt.


5. Install the air lock


The air lock is an important part of the dust collector and one of the key parts to ensure the effect of the dust removal equipment. Therefore, the connection of the air lock and the tongue plate should be in close contact, and the counterweight or hanging ring should be appropriate.


RIELLO

Shanghai Qigu Technology Co., LTD
Block I-J, 14th Floor, Greenland Kechuang Building, 201 Ningxia Road, Putuo District, Shanghai
CHINA China,200333
Burner:Contact +08613761094501
Boiler:Contact +08613761094501
Fax :+08613761094501
E-mail:pittsenli@gmail.com


© Qigu Technology – copyright


Navigation

About Us
Burner
Low nitrogen burner
High temperature burner
Special burner
After service
Company
Contact

Networks

International
België/Belgique (Belgium)
Canada
中国 (China)
Hrvatska (Croatia)
Česká Republika (Czech Republic)
France (France)
Deutschland (Germany)
Magyarország (Hungary)
Italia (Italy)
Latvija (Latvia)
Polska (Poland)
România (Romania)
Россия (Russia)
España (Spain)
Slovenija (Slovenia)
United Kingdom
United States

Link

  • riello spare parts
  • plc control cabinets
  • 空压机配件
  • 电气控制柜
  • 利雅路燃烧器